Do You Have A CIM Project We Can Help With?
Case Study 1
Product Name : Compactor
Critical requirement: Higher Strength, Minimum Wear Out and Cost Reduction.
The Problem
- Aluminum Process+ Machining operations
- Part size is big due to lower material strength
- Wear out life is high
The Solution
- Migrating to ceramic
- one secondary operations
- 5 times strength increased
Results
- Less lead time
- High volume
- Increased customer productivity and strength
- Cost reduction